참고 프로젝트
In this project, processing the earthing stud was carried out by a 4 column press (manual workstation) for pressing the stud into the car's wheel house. The customer part was not pre-punched.
In the press-in machine, the studs were sorted in a bowl feeder, separated and fed one-by-one into the setting head. Customer parts were inserted manually into the machine and positioned under the setting head. The press-in process was started via the 2 hand control.
연락처
KR: +82 51 8321274
연락처 양식
|
Cookie Information
웹사이트 내용을 최적으로 표시하기 위해서 쿠키를 사용하고 있습니다. 브라우저 설정을 통해 쿠키를 차단하거나 처리할 수 있습니다. |